
Critical Path Analysis in Practice
Tavistock Press was established as a co-operative venture between the Tavistock Institute and Routledge & Kegan Paul (RKP) in the 1950s to produce a series of major contributions across the social sciences. This volume is part of a 2001 reissue of a selection of those important works which have since gone out of print, o......
fra 2 449,-
På lager i 2 butikker
Kjøp på nett
Fjernlager
Frakt og levering
På lager
Frakt og levering
Produktinformasjon
<STRONG>Tavistock Press</STRONG> was established as a co-operative venture between the <STRONG>Tavistock Institute</STRONG> and <STRONG>Routledge & Kegan Paul</STRONG> (RKP) in the 1950s to produce a series of major contributions across the social sciences. <BR> This volume is part of a 2001 reissue of a selection of those important works which have since gone out of print, or are difficult to locate. Published by <STRONG>Routledge,</STRONG> 112 volumes in total are being brought together under the name <EM>The International Behavioural and Social Sciences Library: Classics from the Tavistock Press</EM>.<BR> Reproduced here in facsimile, this volume was originally published in 1968 and is available individually. The collection is also available in a number of themed mini-sets of between 5 and 13 volumes, or as a complete collection.<BR>
Spesifikasjon
Produkt
| Produktnavn | Critical Path Analysis in Practice |
| book typ | boker, fagboker, samfunnsvitenskap, sosiologi |
Populære produkter
Pris og prishistorikk
Akkurat nå er 2 449,- den billigste prisen for Critical Path Analysis in Practice blant 2 butikker hos Prisradar. Sjekk også vår topp 5-rangering av beste bøker for å være sikker på at du gjør det beste kjøpet.
Bookshop of Forbidden Books / La libreria de los libros prohibidos (Spanish Edition)Teen Titans Go! Totally Awesome Sticker and Activity BookFind Me Paperback Deluxe Limited EditionBelieve Me Paperback Deluxe Limited Edition
The Rebel DarlingLittle Prince Deluxe Christmas EditionGrief Observed JournalScrewtape Letters Journal


















